1. An application to modify the building or house demolition house (Form 0.1)) or
Application for permission to move the building (Form 0.2).
2. A copy of Company Registration Certificate. Which the objective. T and authorities signed.
Legal representative who issued within 6 months (if the applicant is a legal entity) and authorized.
Certified copy of every page of a series
3. A copy or photograph the size of the original plot of land. And landed a certified copy of every page.
4. Written consent of the landowner The construction of the land or a copy of the lease land. (If the applicant
Not allow land owners) of a series
5. A copy of identity card Registration and a copy of the applicant. Authorized Representative.
Acting on behalf of corporate and land owners. With a certified copy of every page of a series
Documents Application sheet every applicant to sign and seal.
Registration tax up to 6 months personal copy of registration, identification card, passport, a set
Licenses for land in industrial estates T 01 / 2 with the conditions attached to the land and plans to convert a set
Copy of title deed as much real shot - the land of another person if the consent to build the plot of land with land ownership documents from a series
Proxy 30 U.S. tax stamp and copy of ID card, registration, passport delivery, and recipient of the first round series.
Architect Certificate with this form Us. 3 copies (never designed a house site plans, drainage or home safe and November. More than 1,000 square meters to use ordinary architects).
Certificate engineering with leaves Uy. 3 sets (designated use, warehouse PL. More than 1,000 square meters, a special project within 10 m using ordinary the Engineers).
Certificate of Supervision of leaves with Uy. 3 series (high-rise homes and building extra large The ordinary the Engineers.)
Summary of the plan T 02/1-1 completely fill the applicant, architect, engineering certified.
The fc> 65 Ksc. Or fc '> 150 Ksc. To show transcripts show concrete engineers calculate the applicant and certified.
Calculate a set list of cover sheet indicated a house owner, a house, construction, title - qualification - the address of engineers ready to sign each sheet is calculated.
Alter the structurally of homes contiguous to existing structurallys certified engineerings can calculate the weight of the new structurally is safe.
A copy of modifying houses to show the original home permit. And copies of the certified houses (if any).
home or house a large special certificate with a copy of Uy.'s Electrical system and mechanical engineerings. General qualifications up to 3 sets.
Documents prevent major structural fire 3 cm under the Ministerial Regulation No. 48/2540.
Registration of entity trusted institution. Authorized to sign all documents approved a set of sheets.
Copy of identification card. Registration of the authorized signatory. Trusted institutions. With a set of endorsements.
Show a copy of Uy.'s Degree the Engineers who certified the refractory three hours with a set of endorsements.
Certificate from a trusted institution to the applicant by Specific types of refractories for 3 hours a building, the owner with an authorized signature and qualification engineering.
Detailed 3-hour fire protection of materials standards ASTME - 119 are required by the size of the main structure with qualifications in the Engineersing drawings signed.
Certificate of Supervision of major structural fire protection for 3 hours with a copy of Uy. 3 sets (the Parties engineer to work.)
Reference to Building Construction